Trade Resources Industry Views Production of The All-New Honda Nsx Will Begin in 2015 at a New $70.8 Million Performance

Production of The All-New Honda Nsx Will Begin in 2015 at a New $70.8 Million Performance

Honda NSX: Next-Gen Supercar to Be Built at New $70m Plant From 2015

Production of the all-new Honda NSX will begin in 2015 at a new $70.8 million performance manufacturing centre in the US.

The new Ohio-based facility – located close to where the NSX is being engineered – will exclusively assemble the new Honda NSX while its hybrid powertrain will be built at Honda’s Ohio engine plant in Anna.

Honda NSX: Next-Gen Supercar to Be Built at New $70m Plant From 2015_1

Badged as a Honda in Europe and an Acura in the US, the new NSX will be powered by a mid-mounted, direct-injection V6 engine mated to Honda’s three-motor high-performance Sport Hybrid SH-AWD (Super Handling All-Wheel Drive) system and an all-new dual-clutch automatic transmission.

Honda NSX: Next-Gen Supercar to Be Built at New $70m Plant From 2015_2

Honda R&D Americas chief engineer Ted Klaus said the new performance manufacturing centre in Ohio would be key to the NSX’s global success.

“We have a very clear understanding of the high customer expectations luxury buyers around the world have for a supercar, and our challenge is to exceed them and create new value for the customer,” Klaus said.

Honda NSX: Next-Gen Supercar to Be Built at New $70m Plant From 2015_3

The new 17,094-square metre site – which will become Honda’s third car plant in Ohio – will carry on from the Takanezawa and Suzuka plants in Japan that produced the original NSX from 1990-2004 and 2004-2005 respectively.

The latest iteration of the Honda NSX concept was seen at this year’s Detroit auto show in January, revealing a new interior designed around “the synergy between man and machine”.

Source: http://www.caradvice.com.au/231363/honda-nsx-next-gen-supercar-to-be-built-at-new-70m-plant-from-2015/
Contribute Copyright Policy
Honda NSX: Next-Gen Supercar to Be Built at New $70m Plant From 2015