Holz Schiller has since August 2011 invested a total of roughly .5m in the modernisation and expansion of production at its window-scantlings plant specialising in the manufacture of pine scantlings at its site in Cheb in the Czech Republic. Production capacity is thereby to be increased from its previous level of roughly 7, 500 m³ to 20, 000 m³ of window scantlings per year, or 3m running metres per year. Source: euwid-wood-products.com
Source:
http://www.euwid-wood-products.com/news/building-products/single/Artikel/holz-schiller-invests-in-window-scantlings-production.html