In the afternoon of October, 17, as the last conducting wire passed through the No.1705 Tower pulley led by the main hauling cable and running board, completing the riveting line operation, the span of ±800kV Lingzhou-Shaoxing UHV DC ...
Tags: UHV DC line, UHV AC line, power cut