Trade Resources Industry Knowledge Attestation of GS Data Was Introduced

Attestation of GS Data Was Introduced

1.Fill in the application form

2.Sign the total agreement book

3.Zero parts detailed lists

- Fill in my center provide of zero standard format form of the parts detailed list

- This detailed list includes the product model number of all spare partses, produces the factory house, zero parts serial numbers and

Relevant parameter( electric current, electric voltage, power, the grade...etc.).

- For have Anne a machine piece of the rules attestation, for example: power cable, plug, switch,

Control the machine and protect- insurance tube etc., please provide the European attestation certificate to copy the piece.Zero set that have something to do with safety

Piece, such as did not have the safe attestation, please provide the technique parameter, include the product model number and produce the factory

The house, sum settles the electric current, electric voltage, the work temperature...etc., in order to be carried on the random test by us.

4.Contact the food the parts( if have)

- Please provide the authority organization to distribute to that material( plastics, draw the layer etc.) of food hygiene admit the document.

5.Card of

- German, press we to provide the kind draft, the silk prints or uses the PVC not to do the gum, sticking to specify the part in the product.

6.Electric circuit diagram

- Such as demand, my center is free to provide for you.

7.Circuit plank diagram

- Please mark the actual size.

8.German manual

- Such as demand, my center can provide the translation service.

9.End already set sample

-2-4.( press my center request preparation)

10.Explode the diagram( resolve the diagram)

Source: http://www.estcl.org/categoryview_m_401.html
Contribute Copyright Policy
Attestation of GS Data That Need to Be Hand Over