We are one of only a few organizations accepted by TCO Development, and are accredited by The Swedish Board for Accrediation and Conformity Assessment (SWEDAC) to conduct testing and certification to all current Environmental Labeling ...
Tags: TCO Certification, TCO, certification
Solar development in California is influenced by a number of policies, processes and incentives. The growth of the solar industry proceeds according to federal priorities, state-level goals for electricity generation, market conditions and ...
Tags: CEC, CEC Certification, certification
In accordance with OSHA Safety Standards, any product used in the workplace must be approved by a Nationally Recognized Testing Laboratory (NRTL). This is needed to ensure that products can be used safely in the workplace. The NRTL approval ...
Tags: NRTL Certification, NRTL, certification
A / C-tick is by the Australian Communications Authority (Australian Communicatio ns Authority, or ACA) to the communications equipment certification mark. Manufacturers and imports must be in accordance with the following further steps to ...
Tags: C-TICK Certification, C-TICK, certification
The CEC has the statutory authority for licensing all thermal energy projects larger than 50 MW. Solar developers must submit an Application For Certification (AFC) from the CEC, which will issue a separate decision from the BLM. The CEC's ...
Tags: CEC, CEC Certification, certification
National Bureau of Standards South Africa (South African Bureau of Standards, SABS) was promulgated in 1945 under the "National Standards Act" established a subsidiary body of the South African Department of Trade and Industry. South Africa ...
Tags: SABS Certification, SABS, certification
The United States Food and Drug Administration (FDA) Introduction FDA (FDA) under the United States Department of Health Education and Welfare, is responsible for the drugs, food, biological products, cosmetics, veterinary drugs, ...
Tags: FDA, FDA Certification, certification
The ETL is the brief name of the American electronics test laboratory( the Electrical Testing Laboratories).The laboratory of ETL is all establish by American inventor Edison in 1896 of, possessing the very high good reputation within the ...
Tags: ETL, ETL Certification, certification
SABS logo prerequisite for access 1, a product meets the SABS / SANS national standards; 2, product standards through the appropriate testing; 3, to meet the ISO9000 quality system requirements or other specified ...
Tags: SABS Certification, SABS, certification
1, the manufacturer completely filled out the application form; 2, if the factory has more than one plant, they are required to fill in another application form. Certified within the scope of the requirements for each product are ...
Tags: SABS Certification, SABS, certification
Compact Fluorescent Lamps to apply for Energy Star certified reference standards are as follows: ANSI C78.5--1997 Specifications for Performance of Self-Ballasted Compacted Fluorescent Lamps ANSI C78.375--1997 Guide for Electrical ...
Energy Star certification application ResidentialFluorescentLamps the main test items: 1) LampCurrentCrestFactor, LampStart, LampCRI & ColorTemperature 2) SystemEfficacy & PowerFactor 3) Dimming 4) Noise 5) ...
1. EPA Certification Advisory You can telephone, fax, e-mail and any way to our initial intention to apply (for example: Which types of products, which certified the application, the specific models and specifications, product samples ...
Tags: EPA Certification, certification, EPA
BSI signs: Nature: the voluntary (Voluntary) Required standard: safety Voltage: 230Vac Frequency: 50Hz CB system members: Yes BSI British market BEAB accreditation and certification, can be of electronic products, medical ...
Tags: BSI Certification, BSI, certification
�� food products �� medical equipment products �� cosmetics �� radiation electronic products �� nutrition and health products �� Chinese herbal ...
Tags: FDA, FDA Certification, certification