After a comprehensive rebuild supplied by Toscotec, the rebuilt PM10 at Lucart Laval sur Vologne mill in France has been started. The rebuild will boost the machine speed from the current 1300 mpm to 1600 mpm for the production of ...
Toscotec has secured a contract to reconstruct PM1 tissue machine at Correll Tissue facility in Durban, South Africa. The rebuilding of the machine is expected to start in the second half of 2017. Correll Tissue is the primary tissue ...
Tags: Tissue Machine, Toscotec
Toscotec has installed its PM1 machine at the Rossmann Group’s Papeterie Sical facility in Nord-Pas-de-Calais, France. The PM1 machine has been installed at the facility to produce container board products. The machine, which has ...
Tags: TOSCOTEC, Nord-Pas-de-Calais
Italy's Toscotec has agreed to rebuild the dryer section of Smurfit Kappa Papelsa's paper machine (PM) 1 located at Barbosa mill in Colombia. The dryer section rebuild is expected to improve efficiency as well as increase operating speeds ...
Russia-based Syassky Pulp and Paper Mill has signed a contract with Italy’s Toscotec for the supply of a new tissue line at its mill in Syasstroy, in the Leningrad region of Russia. The new equipment will help in producing higher ...
Tags: Syassky Pulp, Paper Mill
Celupaper has entered into an agreement with Italy-based Toscotec for a new PM3 tissue machine and to rebuild the existing PM2 machine at Papelera Nicaragua in Argentina. With the new machines, the company will be able to reach a total ...
Italian paper machinery manufacturer Toscotec will supply a tissue production line to Taiwan-based paper manufacturing company Yuen Foong Yu (YFY). The machine will be installed at the company's mill located in Qingshui District in ...
Tags: Toscotec, Yuen Foong Yu, Packaging