Trade Resources Company News USD 1.5 Billion Ramu Nickel Cobalt Mine Completed Loading Its Maiden Shipment

USD 1.5 Billion Ramu Nickel Cobalt Mine Completed Loading Its Maiden Shipment

Highlands Pacific has announced that the USD 1.5 billion Ramu Nickel Cobalt Mine has recently completed loading its maiden shipment of mixed nickel cobalt hydroxide intermediate product from the Basamuk process plant in Papua New Guinea.

The structure for the Ramu JV is 85% to a Chinese syndicate, 8.56% to Highlands Pacific, 3.94% Mineral Resources Ramu Limited (a subsidiary of MRDC) and 2.5% Mineral Resources Madang Limited (a landowner company).

The shipment will be sent to a Chinese customer, and included 576 dry tonnes containing around 217 tonnes of nickel and 19 tonnes of cobalt. The maiden shipment is for commissioning only, with amounts to increase as the project builds to its full capacity

So far year to date production from Ramu is around 9,465 tonnes dry of mixed nickel cobalt hydroxide intermediate product, containing around 3,536 tonnes of nickel and 332 tonnes of cobalt.

Highlands potential 20.55% in Ramu

Highlands 8.56% interest in Ramu will increase to 11.3% at no cost to Highlands after repayment of the project debt (estimated to take 8 years).

From commissioning, Highlands has access to its pro rata 8.56% share of Ramu's post debt servicing, net cash flow. Highlands also has an option to acquire an additional 9.25 interest in Ramu at fair market value, which could increase the company's interest in the mine to 20.55%, if the option is exercised. 

Source: http://www.steelguru.com/stainless_steel_news/Ramu_Nickel_completes_loading_its_maiden_shipment/292748.html
Contribute Copyright Policy
Ramu Nickel Completes Loading Its Maiden Shipment
Topics: Metallurgy