OGX announces that it has begun, yesterday, the production in the Tubarão Martelo field, located in the BM-C-39 and BM-C-40 blocks, through the horizontal well TBMT-8H.
In November 29, 2013 the Company received the Operating License from IBAMA (the Brazilian Institute for Environment and Renewable Natural Resources), authorizing the operation of FPSO OSX-3 and the respective subsea structures related to the oil production development and outflow for the BM-C-39 and BM-C-40 blocks, located in the Campos Basin.
Source:
http://www.youroilandgasnews.com/news_item.php?newsID=97017