A few days ago, the first EPC project of Baosteel Engineering which involves Vietnam market-----Vietnam CSVC steel plant utility project has successfully entered the heat load test phase.
Facing the situations that the owners shall strictly review the project, the implemented specifications and standard are different from those in the domestic country and that half year of rain season in the local place has brought the difficulties in civil work construction and field equipment management etc, Baosteel Engineering overcame the various difficulties, made the schedule according to the local conditions and made sure of the smooth construction and commissioning of the project, which is affirmed by the owners.
It is known that the project involves the design of the circulating water treatment station, desalting water treatment station, air compressor station and boiler room etc as well as equipment procurement, construction and commissioning etc. The successful implementation of the project has accumulated a lot of experience for Baosteel Engineering to participate in other Vietnam projects and at the same time trained a number of technical, marketing and project management staff who are familiar with the project operation in Southeast Asia.