CSA application procedure for certification
1, will complete the preliminary application form, together with all related products (including all electrical components and plastic materials) the specification and technical data to be CSAInternational.
2, CSAInternational will determine the specific circumstances of product certification costs, and then notify the applicant company by fax.
3, confirmed by the applicant company will send a formal notice of the application form and the notice includes the following requirements:
a, after the signing of a formal application form, by wire transfer certification costs (can be paid in RMB) to the office.
b, a model will be tested in accordance with the notification sent to designated locations.
4, the laboratory will be designated to carry out certification work on time.
5, after the certification test, applicants will be issued a preliminary report (FindingsLetter), set out in detail as follows:
a, what is required to improved product mix in order to meet the standards.
b, the report should be used to complete the certification of other data.
c, please review the certified record of the applicant company (CertificationRecord) the contents of the draft
d, CSA certification mark required, as well as methods to obtain marks.
e, products of the factory tests required (FactoryTests).
6, CSAInternational applicant company will be the fifth of the above answers to be assessed.
7, at the same time to prepare a CSAInternational will be used as a reference and follow-up of products tested by the certification report (CertificationReport).
8, at this stage, in some cases, CSAInternational factory to factory to make the initial assessment (InitialFactoryEvaluation), referred to as IFE.
9, together with the final certification will be CSAInternational record (CertificationRecord) issued a certificate of competency (CertificationofCompliance) authorize the applicant company in its products with the CSA certification mark.
10, and CSAInternational applicants to sign a service agreement (ServiceAgreement), to show the two sides agreed to work in factories to make products CSAInternational follow-up testing, factory acceptance 2-4 times per year plant seized. Applicant company to pay an annual fee each year (AnnualFee) to maintain the agreement.