CIG021 : Factories review process-<BR> uniform provisions of this document containing all manufacturers should provide and implement a typical factory review procedures and tests. Purpose is to ensure that all authenticated the product meets acceptable factory production processes.
Appendix :
AA conventional test
BB testing product testing
CIG022 : accredited before the factory report
A : submission of a request for review by the accreditation body to fill
Part B : factories have to be good to fill in the forms can be carried out before the factory accredited review. The forms should be filled out in detail, especially in relation to paragraph b.6.1, b.6.2 be annotated inspection and test sampling rate and the scope of testing parameters.
CIG023 : Factories <BR> review of the report by the inspector in the review before issuing or conventional complete review. The inspector should reference 58022 022 B part of the content, and with the actual situation of comparison, then complete the report.
During routine inspection completed the purpose of the report is to ensure that the CCA certification period, testing and quality management procedures to comply with the relevant standards.
Appendix CIG023 ENEC
In the case where the need to use this Appendix :
ENEC products factory production
Quality System requirements
Factories no recognition of the quality system certification bodies
CIG024 : Factories <BR> review implementation of wellness checks and product testing confirmed the relevance of the VDE standard form of a PM Description. Specific reference standard version of each product category should be created as a separate form the basis for certification documents.
VDE review process has always included with the current certificate of a "PM" content.
Certification factories in the trial period, the general staff will review, "PM" to the manufacturer
Source:
http://www.estcl.org/categoryview_m_406.html